The challenge
Rejected panels had to leave the production line without blocking good panels on their way to the gantry. The customer supplied the mechanics; everything else had to be added: electrics, pneumatics, controls and safety, in a line that keeps running.
Our approach
- A new pneumatic stopper in the line diverts scrap panels to our roller conveyor and holds the next scrap panel until the conveyor is free
- A right-angle belt transfer pushes each panel onto the fork system; after every panel the forks lower one panel thickness, controlled by a sensor
- When the stack is full it moves via the chain conveyor to buffer position 2 if free, otherwise to buffer 1
- Four movements on Siemens G120C VFDs, I/O via Turck IO-Link blocks, safeguarding with light curtains
- Code in the existing line PLC, connected via PROFINET, with its own HMI screen in Dutch, French and English
- Delivered turnkey: control panel, machine wiring, valves and components, including the CE file